Get a demolition permit from the Mapandan Municipal Engineer. Required before demolishing any building or structure.
Description
A demolition permit is required before any demolition of a building or structure in Mapandan. The Municipal Engineer conducts initial assessment of the application, site inspection, and computation of fees. The permit is issued after payment and verification of all requirements.
Requirements
- Application for demolition permit
- Approved demolition plans (if applicable)
- Proof of ownership or authorization from owner
Procedure
- Report to the Engineering Office for assessment of your application (15 min).
- Engineering staff conducts site inspection (1 hour).
- Staff computes the required assessment fee (15 min).
- Pay the necessary fees at the Treasury Office and obtain official receipt (10 min).
- Present OR to Engineering Staff. Staff prepares the demolition permit (15 min).
- Receive the demolition permit (5 min).