Gusali, Engineering, at Zoning
Occupancy Permit
Kumuha ng occupancy permit mula sa Mapandan MEO. RA 11032 processing times: 3–20 working days.
Paglalarawan
An occupancy permit certifies that a building or structure has been completed and inspected in accordance with the approved plans and the National Building Code. It is required before any building may be legally occupied or used.
Mga Kinakailangan
- Xerox copy of approved building permit
- Fire safety inspection certificate (from BFP)
Prosedura
- Request a final inspection from the Municipal Engineering Office.
- Submit the as-built plans and inspection report.
- Obtain a fire safety inspection certificate from the BFP.
- Submit all documents to the MEO for review.
- Receive the occupancy permit upon approval.